Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 25, 2022, 09:19 AM
  • 08 0082_08 0081_01252022_013337.mp4

Date
01/25/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00110
Time
1:19 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9712
Sewer Name
08 MAIN STREET TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
12 in.
Upstream MH
08 0082
Downstream MH
08 0081
Dir. of Survey
Downstream
Length Surveyed
167.4 ft.
Total Length
167.4 ft.
Structural Index
2
Structural Quick
3E2F
Structural Rating
164
O&M Index
2
O&M Quick
2F00
O&M Rating
66
Overall Index
2
Overall Quick
Overall Rating
230
Pipe schematic from manhole 08 0082 to 08 0081
MH: 08 0082MH: 08 0081downstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 00820 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start15.7 ft. CS - Crack Spiral, from 03 to 04 o'clock, within 8 inches of joint: YES16.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"32.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN65.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"116.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN164.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish165 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish165 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish167 ft. MGO - General Observation - ROACHES @ MH167.4 ft. AMH - Downstream Manhole, Survey Ends - 08 0081167.4 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE167.4 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Spiral, from 03 to 04 o'clock, within 8 inches of joint: YES

    15.7 ft. - Crack Spiral, from 03 to 04 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
32.5TBOPEN
0MWL
167.4AMH08 0081
0AMH08 0082
2CM
16.5TFC
2SSS
2DAGS
167.4MGOCONN @ MH 3 O'CLOCK/ACTIVE
15.7CS
116.8TFOPEN
167MGOROACHES @ MH
0MWM
65.1TFC
164.2CM
165DAGS
167.4MGOCONN @ MH 9 O'CLOCK/CAPPED
165SSS

Properties (7)

additional_info
630098012422201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-01-25T01:19:38-08:00
documentation
PRO PIPE
is_lateral_inspection
false