Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 25, 2022, 10:25 AM
  • 08 0080_08 0079_01252022_024142.mp4

Date
01/25/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00108
Time
2:25 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9712
Sewer Name
08 MAIN STREET TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
12 in.
Upstream MH
08 0080
Downstream MH
08 0079
Dir. of Survey
Downstream
Length Surveyed
411.7 ft.
Total Length
411.7 ft.
Structural Index
3
Structural Quick
3P2O
Structural Rating
411
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
415
Pipe schematic from manhole 08 0080 to 08 0079
MH: 08 0080MH: 08 0079downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 00800 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.5 ft. CM - Crack Multiple, from 05 to 10 o'clock, within 8 inches of joint: YES60.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"113 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"163.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"209.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN261.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"313.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"362.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"409 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish409 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish409.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish411 ft. MGO - General Observation - ROACHES @ MH411.7 ft. AMH - Downstream Manhole, Survey Ends - 08 0079

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 05 to 10 o'clock, within 8 inches of joint: YES

    7.5 ft. - Crack Multiple, from 05 to 10 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
0MWM
2DAGS
409SSS
411.7AMH08 0079
60.9TFC
409.9CM
313.5TFC
0AMH08 0080
2CM
113TFC
209.7TFOPEN
163.8TFC
7.5CM
362.2TFC
261.4TFA
409DAGS
2SSS
0MWL
411MGOROACHES @ MH

Properties (7)

additional_info
630098012422201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-01-25T02:25:53-08:00
documentation
PRO PIPE
is_lateral_inspection
false