Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 26, 2022, 11:17 AM
  • 08 0075_08 0074_01262022_034528.mp4

Date
01/26/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00077
Time
3:17 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9714
Sewer Name
08 MAIN STREET TRUNK
City
WILLOWBROOK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
15 in.
Upstream MH
08 0075
Downstream MH
08 0074
Dir. of Survey
Downstream
Length Surveyed
335.4 ft.
Total Length
335.4 ft.
Structural Index
2
Structural Quick
352O
Structural Rating
177
O&M Index
2
O&M Quick
332K
O&M Rating
131
Overall Index
2
Overall Quick
Overall Rating
308
Pipe schematic from manhole 08 0075 to 08 0074
MH: 08 0075MH: 08 0074downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 00750 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.3 ft. CM - Crack Multiple, from 10 to 11 o'clock, within 8 inches of joint: YES11.2 ft. CS - Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES47.7 ft. CS - Crack Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES54.4 ft. CM - Crack Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES55 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 8"74.9 ft. CS - Crack Spiral, from 11 to 12 o'clock, within 8 inches of joint: YES103.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"114.4 ft. CS - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES122 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start154.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"155.4 ft. CS - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES173 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish202.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"202.3 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish234 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 06 to 07 o'clock, , within 8 inches of joint: YES240.1 ft. CM - Crack Multiple, from 07 to 09 o'clock, within 8 inches of joint: YES242.8 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES252.3 ft. CM - Crack Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES253.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"263 ft. MWL - Water Level, 20 %of cross sectional area268.6 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start270.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start273.2 ft. CS - Crack Spiral, from 10 to 12 o'clock, within 8 inches of joint: YES284.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish284.8 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start288.3 ft. CS - Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES293.2 ft. DAR - Deposits Attached Ragging, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES293.2 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish298.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start298.2 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish305.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"327.3 ft. CS - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES330.6 ft. CS - Crack Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES333 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335 ft. MGO - General Observation - ROACHES @ MH335.4 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ABANDONED335.4 ft. AMH - Downstream Manhole, Survey Ends - 08 0074335.4 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (21)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 10 to 11 o'clock, within 8 inches of joint: YES

    2.3 ft. - Crack Multiple, from 10 to 11 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES

    11.2 ft. - Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

    47.7 ft. - Crack Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES

    54.4 ft. - Crack Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 11 to 12 o'clock, within 8 inches of joint: YES

    74.9 ft. - Crack Spiral, from 11 to 12 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

    114.4 ft. - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

    155.4 ft. - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 10 %of cross sectional area, from 06 to 07 o'clock,  , within 8 inches of joint: YES

    234 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 06 to 07 o'clock, , within 8 inches of joint: YES

  • Crack Multiple, from 07 to 09 o'clock, within 8 inches of joint: YES

    240.1 ft. - Crack Multiple, from 07 to 09 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    242.8 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES

    252.3 ft. - Crack Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 10 %of cross sectional area, Start

    268.6 ft. - Water Level, Sag in pipe, 10 %of cross sectional area, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    270.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 10 to 12 o'clock, within 8 inches of joint: YES

    273.2 ft. - Crack Spiral, from 10 to 12 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    284.8 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES

    288.3 ft. - Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES

  • Deposits Attached Ragging, 15 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES

    293.2 ft. - Deposits Attached Ragging, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    298.2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

    327.3 ft. - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES

    330.6 ft. - Crack Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES

Observations (45)

DistanceCodeObservation
74.9CS
263MWL
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
2.3CM
327.3CS
2SSS
305.1TFC
270.5DAGS
288.3CS
293.2DAR
284.8DAGS
335.4MGOCONN @ MH 3 O'CLOCK/ABANDONED
298.2DAGS
333SSS
11.2CS
155.4CS
173DAE
0MWL
293.2DAGS
335.4AMH08 0074
273.2CS
335MGOROACHES @ MH
122DAE
330.6CS
252.3CM
253.3TFA
0AMH08 0075
242.8CM
202.3TFA
47.7CS
0MWM
234DAGS
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
154.3TFC
55TFA
54.4CM
240.1CM
2DAGS
268.6MWLS
335.4DAGS
202.3DAGS
298.2MWLS
114.4CS
103.4TFC
284.8DAGS

Properties (7)

additional_info
630074012522201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-01-26T03:17:28-08:00
documentation
PRO PIPE
is_lateral_inspection
false