Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 26, 2022, 07:22 AM
  • 08 0090_08 0089_01252022_234229.mp4

Date
01/25/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00118
Time
11:22 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9714
Sewer Name
08 MAIN STREET TRUNK
City
WILLOWBROOK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
8 in.
Upstream MH
08 0090
Downstream MH
08 0089
Dir. of Survey
Downstream
Length Surveyed
295 ft.
Total Length
295 ft.
Structural Index
2
Structural Quick
3K2K
Structural Rating
294
O&M Index
2
O&M Quick
2K12
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
412
Pipe schematic from manhole 08 0090 to 08 0089
MH: 08 0090MH: 08 0089downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 00902 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start10.8 ft. CS - Crack Spiral, from 03 to 10 o'clock, within 8 inches of joint: YES23.2 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES45.5 ft. RFJ - Roots Fine Joint, from 02 to 03 o'clock, within 8 inches of joint: YESR69.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 8"81 ft. RFJ - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YESR171.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 8"291.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish291.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish292 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish294 ft. MGO - General Observation - ROACHES @ MH295 ft. AMH - Downstream Manhole, Survey Ends - 08 0089295 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (6)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 03 to 10 o'clock, within 8 inches of joint: YES

    10.8 ft. - Crack Spiral, from 03 to 10 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES

    23.2 ft. - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, from 02 to 03 o'clock, within 8 inches of joint: YESR

    45.5 ft. - Roots Fine Joint, from 02 to 03 o'clock, within 8 inches of joint: YESR

  • Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YESR

    81 ft. - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YESR

Observations (18)

DistanceCodeObservation
171.6TFC
2SSS
295AMH08 0089
81RFJ
2CM
45.5RFJ
0MWL
291.8CM
294MGOROACHES @ MH
10.8CS
2.6DAGS
291.8DAGS
0MWM
69.9TFC
0AMH08 0090
295MGOCONN @ MH 9 O'CLOCK/ACTIVE
292SSS
23.2CL

Properties (7)

additional_info
630074012522201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-01-25T23:22:26-08:00
documentation
PRO PIPE
is_lateral_inspection
false