Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 26, 2022, 07:44 AM
  • 08 0089_08 0088_01252022_235224.mp4

Date
01/25/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00117
Time
11:44 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9714
Sewer Name
08 MAIN STREET TRUNK
City
WILLOWBROOK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
8 in.
Upstream MH
08 0089
Downstream MH
08 0088
Dir. of Survey
Downstream
Length Surveyed
53.9 ft.
Total Length
53.9 ft.
Structural Index
2
Structural Quick
392A
Structural Rating
47
O&M Index
2
O&M Quick
2A00
O&M Rating
20
Overall Index
2
Overall Quick
Overall Rating
67
Pipe schematic from manhole 08 0089 to 08 0088
MH: 08 0089MH: 08 0088downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 00892 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"7.9 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES11 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start51 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish51.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish51.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish53 ft. MGO - General Observation - ROACHES @ MH53.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED53.9 ft. AMH - Downstream Manhole, Survey Ends - 08 008853.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

    7.9 ft. - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
3TFC
51SSS
53.9MGOCONN @ MH 3 O'CLOCK/CAPPED
53.9AMH08 0088
11CM
51.2DAGS
7.9CM
2.3DAGS
2SSS
53.9MGOCONN @ MH 9 O'CLOCK/CAPPED
0MWL
0MWM
51.2CM
0AMH08 0089
53MGOROACHES @ MH

Properties (7)

additional_info
630074012522201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-01-25T23:44:00-08:00
documentation
PRO PIPE
is_lateral_inspection
false