Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 26, 2022, 09:08 AM
  • 08 0087_08 0086_01262022_012540.mp4

Date
01/26/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00115
Time
1:08 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9714
Sewer Name
08 MAIN STREET TRUNK
City
WILLOWBROOK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
8 in.
Upstream MH
08 0087
Downstream MH
08 0086
Dir. of Survey
Downstream
Length Surveyed
321 ft.
Total Length
321 ft.
Structural Index
3
Structural Quick
3J22
Structural Rating
172
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
300
Pipe schematic from manhole 08 0087 to 08 0086
MH: 08 0087MH: 08 0086downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 08 00870 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"70.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"120.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"171.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"221.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"272.3 ft. TBC - Tap Break-In Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"289.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish318 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish318.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES318.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish321 ft. AMH - Downstream Manhole, Survey Ends - 08 0086321 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    12.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    318.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
171.4TFC
318SSS
221.8TFC
318.2CM
0AMH08 0087
0MWM
0MWL
17.2TFC
318.3DAGS
120.6TFC
321AMH08 0086
12.9CM
2DAGS
321MGOCONN @ MH 9 O'CLOCK/ACTIVE
2SSS
289.9CM
272.3TBC
70.2TFC

Properties (7)

additional_info
630074012522201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-01-26T01:08:42-08:00
documentation
PRO PIPE
is_lateral_inspection
false