Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 26, 2022, 09:26 AM
  • 08 0086_08 0085_01262022_013528.mp4

Date
01/26/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00114
Time
1:26 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9714
Sewer Name
08 MAIN STREET TRUNK
City
WILLOWBROOK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
8 in.
Upstream MH
08 0086
Downstream MH
08 0085
Dir. of Survey
Downstream
Length Surveyed
90 ft.
Total Length
90 ft.
Structural Index
2
Structural Quick
322C
Structural Rating
44
O&M Index
2
O&M Quick
2C00
O&M Rating
36
Overall Index
2
Overall Quick
Overall Rating
80
Pipe schematic from manhole 08 0086 to 08 0085
MH: 08 0086MH: 08 0085downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 00860 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7 ft. CM - Crack Multiple, from 09 to 11 o'clock, within 8 inches of joint: YES15.7 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES51 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"78.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES85.5 ft. CS - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES87 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish89 ft. MGO - General Observation - ROACHES @ MH89.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish90 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN90 ft. AMH - Downstream Manhole, Survey Ends - 08 0085

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 11 o'clock, within 8 inches of joint: YES

    7 ft. - Crack Multiple, from 09 to 11 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    15.7 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    78.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

    85.5 ft. - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
89MGOROACHES @ MH
0MWM
89.1DAGS
90MGOCONN @ MH 9 O'CLOCK/OPEN
87SSS
90AMH08 0085
78.6CM
85.5CS
7CM
0MWL
51TBC
0AMH08 0086
2SSS
15.7CL
2.1DAGS
0MGOCONN @ MH 9 O'CLOCK/OPEN

Properties (7)

additional_info
630074012522201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-01-26T01:26:48-08:00
documentation
PRO PIPE
is_lateral_inspection
false