Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2022, 07:39 AM
  • 08 0045_08 0044_02022022_235422.mp4

Date
02/02/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00047
Time
11:39 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9723
Sewer Name
08 MAIN STREET TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
21 in.
Upstream MH
08 0045
Downstream MH
08 0044
Dir. of Survey
Downstream
Length Surveyed
311.8 ft.
Total Length
311.8 ft.
Structural Index
2
Structural Quick
3H2K
Structural Rating
263
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
397
Pipe schematic from manhole 08 0045 to 08 0044
MH: 08 0045MH: 08 0044downstream0 ft. AMH - Upstream Manhole, Survey Begins - 08 00450 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start31.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN79.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"129.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"177.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"228.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"238.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish259.3 ft. CM - Crack Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES279.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN281.4 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start309 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish309 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish310.5 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish311 ft. MGO - General Observation - ROACHES @ MH311.8 ft. AMH - Downstream Manhole, Survey Ends - 08 0044

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES

    259.3 ft. - Crack Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES

  • Deposits Settled Compacted,  5 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    281.4 ft. - Deposits Settled Compacted, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
311.8AMH08 0044
177.5TFC
31.5TFOPEN
2SSS
2DAGS
0AMH08 0045
281.4DSC
279.6TFOPEN
0MWM
129.9TFC
228.3TFC
8.4CM
310.5DSC
311MGOROACHES @ MH
309DAGS
0MGOROACHES @ MH
259.3CM
0MWL
238.5CM
309SSS
79.2TFC

Properties (7)

additional_info
630074020222201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-02-02T23:39:48-08:00
documentation
PRO PIPE
is_lateral_inspection
false