Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2022, 09:21 AM
  • 08 0041_08 0040_02032022_013427.mp4

Date
02/03/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00043
Time
1:21 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9723
Sewer Name
08 MAIN STREET TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
21 in.
Upstream MH
08 0041
Downstream MH
08 0040
Dir. of Survey
Downstream
Length Surveyed
311.9 ft.
Total Length
311.9 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
308
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
2
Overall Quick
Overall Rating
430
Pipe schematic from manhole 08 0041 to 08 0040
MH: 08 0041MH: 08 0040downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 00410 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"65.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"113.4 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 6"167.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"215 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"262.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"309 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish309 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish311.9 ft. AMH - Downstream Manhole, Survey Ends - 08 0040311.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish311.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE311.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0MWL
0AMH08 0041
167.2TFC
311.9AMH08 0040
2DAGS
65.4TFC
311.9CM
0MWM
2SSS
262.9TFC
215TFC
311.9MGOCONN @ MH 3 O'CLOCK/ACTIVE
311.9MGOCONN @ MH 9 O'CLOCK/ACTIVE
2CM
14.3TFC
309DAGS
309SSS
113.4TFA

Properties (7)

additional_info
630074020222201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-02-03T01:21:36-08:00
documentation
PRO PIPE
is_lateral_inspection
false