Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 9, 2022, 07:29 AM
  • 20 0192_20 0191_02082022_234836.mp4

Date
02/08/2022
W/O
936488
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00739
PipeID
P19116
Time
11:29 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9867
Sewer Name
20 OUTFALL TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_936488_TV20060_FEB2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0192
Downstream MH
20 0191
Dir. of Survey
Downstream
Length Surveyed
397.4 ft.
Total Length
397.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
3121
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 20 0192 to 20 0191
MH: 20 0192MH: 20 0191downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01922 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"31.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"80 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"83.2 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"129.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"132.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"178.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"181.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"230.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"233.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"248.5 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS264.2 ft. DSC - Deposits Settled Compacted, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES273.9 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish280.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"283.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"332.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"335.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"384.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"395.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish397.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK397.4 ft. AMH - Downstream Manhole, Survey Ends - 20 0191

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Compacted,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES

    264.2 ft. - Deposits Settled Compacted, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES

Observations (25)

DistanceCodeObservation
129.2TFC
0MWM
0MWL
28.2TFC
132.2TFC
397.4MGOCONNECTION AT MH 3 O'CLOCK
273.9DSZ
80TFC
335.9TFC
233.6TFC
178.1TFC
230.3TFC
248.5DSZDEBRIS
181.4TFC
0AMH20 0192
280.4TFC
332.8TFC
283.4TFC
2SAP
83.2TBA
31.1TFC
397.4AMH20 0191
395.2SAP
264.2DSC
384.4TFC

Properties (7)

additional_info
630138020822201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2022-02-08T23:29:02-08:00
documentation
PRO PIPE
is_lateral_inspection
false