Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 8, 2022, 06:16 AM
  • 01 1082_01 1081_02072022_223736.mp4

Date
02/07/2022
W/O
936473
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00210
PipeID
P01931
Time
10:16 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9724
Sewer Name
01 HUNTINGTON PARK TRUNK
City
CUDAHY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_936473_TV01246_FEB2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
18 in.
Upstream MH
01 1082
Downstream MH
01 1081
Dir. of Survey
Downstream
Length Surveyed
395.8 ft.
Total Length
395.8 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
228
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
228
Pipe schematic from manhole 01 1082 to 01 1081
MH: 01 1082MH: 01 1081downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 10820 ft. MWL - Water Level, 20 %of cross sectional area10.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES17.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start393.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish395.8 ft. AMH - Downstream Manhole, Survey Ends - 01 1081

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    10.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    17.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWM
10.4CM
0AMH01 1082
393.4CM
17.9CM
0MWL
395.8AMH01 1081

Properties (7)

additional_info
630074020722201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-02-07T22:16:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false