Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 11, 2022, 06:25 AM
  • 05 0725_05 0724_02102022_225012.mp4

Date
02/10/2022
W/O
936484
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00521
PipeID
P05948
Time
10:25 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9733
Sewer Name
05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK, EXTENSION #1
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_936484_TV05333_FEB2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
05 0725
Downstream MH
05 0724
Dir. of Survey
Downstream
Length Surveyed
354.9 ft.
Total Length
354.9 ft.
Structural Index
3
Structural Quick
514E
Structural Rating
258
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
258
Pipe schematic from manhole 05 0725 to 05 0724
MH: 05 0725MH: 05 0724downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 07250 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWM - Water Mark, 40 %of cross sectional area5.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"38 ft. FM - Fracture Multiple, from 07 to 08 o'clock, within 8 inches of joint: YES59.9 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"66.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"106.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"114.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"168.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"196 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"207 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"208.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish208.4 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start216.9 ft. B - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES280.2 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Start284.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"297.3 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Finish312.2 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start324.4 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish354.9 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK354.9 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish354.9 ft. AMH - Downstream Manhole, Survey Ends - 05 0724

Observation photos (9)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 07 to 08 o'clock, within 8 inches of joint: YES

    38 ft. - Fracture Multiple, from 07 to 08 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    59.9 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    106.5 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"

    196 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    208.4 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

    216.9 ft. - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 20 %of cross sectional area, Start

    280.2 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start

  • Water Level, Sag in pipe, 15 %of cross sectional area, Start

    312.2 ft. - Water Level, Sag in pipe, 15 %of cross sectional area, Start

Observations (25)

DistanceCodeObservation
0MWL
5.2CM
208.4CM
12.4TF
196TB
38FM
59.9TB
208.4FM
66.3TFC
0AMH05 0725
207TFC
354.9MGOCONNECTION AT THE MH 9 OC'LOCK
324.4MWLS
0MGOCONNECTION AT THE MH 9 OC'LOCK
280.2MWLS
168.2TFC
354.9FM
114.3TFC
0MWM
284.3TF
354.9AMH05 0724
312.2MWLS
297.3MWLS
106.5TB
216.9B

Properties (7)

additional_info
630074021022201
custom_field_three
BROKEN, FRACTURES
custom_field_two
1
customer
1
datetime
2022-02-10T22:25:15-08:00
documentation
PRO PIPE
is_lateral_inspection
false