05 0282_05 0281_3182022_012039.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
2 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT
2 ft. - General Observation - MAG COAT 98% START
6 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: NO - CIRCUM REBAR UNDER MAG COAT
105.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT
| Distance | Code | Observation |
|---|---|---|
| 325.3 | SAM | SEVERE AGG |
| 325.3 | DAGS | — |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 2 | DAGS | — |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 0 | MWM | — |
| 0 | MWL | — |
| 325.3 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 2 | SAM | SEVERE AGG UNDER MAG COAT |
| 325.9 | AMH | 1:25AM |
| 325.3 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 6 | SRC | CIRCUM REBAR UNDER MAG COAT |
| 2 | MGO | MAG COAT 98% START |
| 0 | AMH | 12:55AM |
| 105.2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 325.3 | MGO | 98% MAG COAT |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 325.3 | MGO | Conn. @ Mh, 3 O' Clock. Active |