Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 17, 2022, 08:03 AM
  • 05 0293_05 0292_3172022_011025.mp4

Date
03/17/2022
W/O
0936513
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00498
PipeID
P05501
Time
1:03 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3038
Sewer Name
05 OAK STREET-CENTER AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
04
Purpose
Capital Improvement Program Assesment
Project
20220316MDM_OAK_STREET_CENTER_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
22 in.
Upstream MH
05 0293
Downstream MH
05 0292
Dir. of Survey
Downstream
Length Surveyed
319 ft.
Total Length
319 ft.
Structural Index
3
Structural Quick
4123
Structural Rating
10
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 05 0293 to 05 0292
MH: 05 0293MH: 05 0292downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:05AM2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG5.4 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - MULTI LAYER PEELING CONCRETE SEVERE AGG ATTACHED182.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED318.1 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG318.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish318.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED319 ft. AMH - Downstream Manhole, Survey Ends - 1:30AM

Observation photos (5)

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - MULTI LAYER PEELING CONCRETE SEVERE AGG ATTACHED

    5.4 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - MULTI LAYER PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

    182.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

Observations (14)

DistanceCodeObservation
0MGOConn. @ Mh, 3 O' Clock. Active
318.1SAMSEVERE AGG
182.2SSSPEELING CONCRETE SEVERE AGG ATTACHED
2DAGS
5.4SSSMULTI LAYER PEELING CONCRETE SEVERE AGG ATTACHED
0MWM
2SSSPEELING CONCRETE SEVERE AGG ATTACHED
0MGOConn. @ Mh, 9 O' Clock. Active
0MWL
0AMH1:05AM
2SAMSEVERE AGG
318.1DAGS
319AMH1:30AM
318.1SSSPEELING CONCRETE SEVERE AGG ATTACHED

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
2
customer
LACSD
datetime
2022-03-17T01:03:10-07:00
documentation
MARTIN,REVELES,OLIVER111,CASTILLO
is_lateral_inspection
false