- Date
- 01/11/2022
- W/O
- 926626
- Weather
- Dry
- Operator/Surveyor
- S. LOPEZ
- Sewer ID
- Z00252
- PipeID
- P03491
- Time
- 2:14 AM
- Certificate
- U-0720-70309212
- System Owner
- 1
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K9824
- Sewer Name
- 02 DOWNEY-BELLFLOWER DIVERSION TRUNK
- City
- PICO RIVERA
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 25
- Purpose
- Routine Assessment
- Project
- WO_926626_TV02053_DEC2021
- Sewer Type
- Gravity
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 24 in.
- Width
- 15 in.
- Upstream MH
- 02 0923
- Downstream MH
- 02 0922
- Dir. of Survey
- Downstream
- Length Surveyed
- 41.6 ft.
- Total Length
- 41.6 ft.
- Structural Index
- 2
- Structural Quick
- 2100
- Structural Rating
- 2
- O&M Index
- 3
- O&M Quick
- 4121
- O&M Rating
- 6
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 8
Pipe schematic from manhole 02 0923 to 02 0922 Observation photos (3)

0 ft. - General Observation - COCKROACHES IN MH

2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

25.3 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES