Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 24, 2022, 09:07 PM
  • 29 0192_29 0191_01242022_132359.mp4

Date
01/24/2022
W/O
936491
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01025
PipeID
P24089
Time
1:07 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9582
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_936491_TV29101_FEB2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0192
Downstream MH
29 0191
Dir. of Survey
Downstream
Length Surveyed
254.2 ft.
Total Length
254.2 ft.
Structural Index
4
Structural Quick
4I31
Structural Rating
203
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
203
Pipe schematic from manhole 29 0192 to 29 0191
MH: 29 0192MH: 29 0191downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 01920 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 5 %of cross sectional area4.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES5.2 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES9.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start51.4 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"54.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"57.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"101.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"108.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"135.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"153.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"156.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"205.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"208.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"242.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"245 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"252.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish254.2 ft. AMH - Downstream Manhole, Survey Ends - 29 0191

Observation photos (4)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    4.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    5.2 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    9.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    51.4 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

Observations (20)

DistanceCodeObservation
153.5TFC
252.7FM
54.1TFC
101.6TFC
4.4FM
245TF
51.4TB
0AMH29 0192
208.5TFC
0MWL
108.5TFC
156.9TFC
205.6TF
9.7FM
242.3TF
135.5TF
57.4TFC
5.2FL
254.2AMH29 0191
0MWM

Properties (7)

additional_info
630098012422062
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
3
customer
1
datetime
2022-01-24T13:07:22-08:00
documentation
PROPIPE
is_lateral_inspection
false