Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 24, 2022, 09:24 PM
  • 29 0191_29 0190_01242022_134142.mp4

Date
01/24/2022
W/O
936491
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01025
PipeID
P24088
Time
1:24 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9582
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_936491_TV29101_FEB2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0191
Downstream MH
29 0190
Dir. of Survey
Downstream
Length Surveyed
283.8 ft.
Total Length
283.8 ft.
Structural Index
4
Structural Quick
4I36
Structural Rating
219
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
219
Pipe schematic from manhole 29 0191 to 29 0190
MH: 29 0191MH: 29 0190downstream0 ft. MWM - Water Mark, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 01910 ft. MWL - Water Level, 5 %of cross sectional area4.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish48.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"51.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"76.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"97.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"100.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"149.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"152.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"198.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"200 ft. JOM - Joint Offset Medium201.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"212.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"254.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"281.5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish283.8 ft. AMH - Downstream Manhole, Survey Ends - 29 0190

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    32 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
283.8AMH29 0190
51.4TF
0MWM
201.5TFC
32FM
212.8TF
281.5FM
0AMH29 0191
152.1TF
4.3CM
0MWL
48.3TFC
200JOM
76.1TFC
254.7TFC
97.7TFC
198.3TF
32CM
100.5TF
149.1TF

Properties (7)

additional_info
630098012422062
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
3
customer
1
datetime
2022-01-24T13:24:28-08:00
documentation
PROPIPE
is_lateral_inspection
false