- Date
- 01/24/2022
- W/O
- 931723
- Weather
- Dry
- Operator/Surveyor
- S. LOPEZ
- Sewer ID
- Z00283
- PipeID
- P04205
- Time
- 4:29 AM
- Certificate
- U-0720-70309212
- System Owner
- 1
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K9848
- Sewer Name
- 02 MONTEBELLO INTERCEPTOR TRUNK, SECTS 1&2
- City
- MONTEBELLO
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 18
- Purpose
- Routine Assessment
- Project
- RFIR_WO_931723_TV02213_JAN2022
- Sewer Type
- Gravity
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 27 in.
- Width
- 15 in.
- Upstream MH
- 02 2104
- Downstream MH
- 02 2103
- Dir. of Survey
- Downstream
- Length Surveyed
- 429.7 ft.
- Total Length
- 429.7 ft.
- Structural Index
- 3
- Structural Quick
- 3121
- Structural Rating
- 5
- O&M Index
- 2
- O&M Quick
- 2100
- O&M Rating
- 2
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 7
Pipe schematic from manhole 02 2104 to 02 2103 Observation photos (4)

2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

7.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

7.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

429.7 ft. - General Observation - COCKROACHES IN MH