Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 19, 2022, 11:27 AM
  • 02 1844_02 1843_01192022_033548.mp4

Date
01/19/2022
W/O
931723
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00283
PipeID
P04189
Time
3:27 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9838
Sewer Name
02 MONTEBELLO INTERCEPTOR TRUNK, SECTS 1&2
City
COMMERCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_931723_TV02213_JAN2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
12 in.
Upstream MH
02 1843
Downstream MH
02 1844
Dir. of Survey
Upstream
Length Surveyed
94.6 ft.
Total Length
94.6 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 02 1843 to 02 1844
MH: 02 1843MH: 02 1844upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 18441.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish1.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish24.4 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start77.1 ft. MGO - General Observation - MAG COAT92.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start92.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start92.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start94.6 ft. MWL - Water Level, 25 %of cross sectional area94.6 ft. AMH - Downstream Manhole, Survey Begins - 02 184394.6 ft. MWM - Water Mark, 50 %of cross sectional area

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    17.5 ft. - General Observation - MAG COAT

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    70.2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2DAGS
0MWL
92.8DAGS
17.5MGOMAG COAT
0AMH02 1843
0MWM
92.8SAP
94.6AMH02 1844
2SSS
92.8SRV
2SAP
70.2SRV
92.8SSS

Properties (7)

additional_info
630138011822202
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-01-19T03:27:19-08:00
documentation
PRO PIPE
is_lateral_inspection
false