Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 14, 2022, 06:07 AM
  • 02 1089_02 1088_01132022_222454.mp4

Date
01/13/2022
W/O
931783
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00282
PipeID
P03663
Time
10:07 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9828
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_931783_TV02212_JAN2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1089
Downstream MH
02 1088
Dir. of Survey
Downstream
Length Surveyed
350.3 ft.
Total Length
350.3 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
343
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
481
Pipe schematic from manhole 02 1089 to 02 1088
MH: 02 1089MH: 02 1088downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 10890 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 15% MAG COAT7.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start45.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"95.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"145.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN157 ft. MWL - Water Level, 15 %of cross sectional area194.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"245 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"293.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"334.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"348 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish348.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish348.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish350.3 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE350.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1088

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0MWL
157MWL
145.9TFOPEN
334.7TFC
350.3MGOCONN @ MH 3 O'CLOCK/ACTIVE
348.5SAP
293.2TFC
7.6SSS
194.6TFC
0AMH02 1089
348.5SSS
2DAGS
350.3AMH02 1088
348DAGS
245TFC
2SAP
95.3TFC
2MGO15% MAG COAT
0MWM
45.6TFC

Properties (7)

additional_info
630138011322201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-01-13T22:07:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false