Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 14, 2022, 06:25 AM
  • 02 1088_02 1087_01132022_223605.mp4

Date
01/13/2022
W/O
931783
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00282
PipeID
P03662
Time
10:25 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9828
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_931783_TV02212_JAN2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
24 in.
Upstream MH
02 1088
Downstream MH
02 1087
Dir. of Survey
Downstream
Length Surveyed
341.5 ft.
Total Length
341.5 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
2
O&M Quick
2M00
O&M Rating
144
Overall Index
2
Overall Quick
Overall Rating
479
Pipe schematic from manhole 02 1088 to 02 1087
MH: 02 1088MH: 02 1087downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 10880 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 30% MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start46.7 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"95.6 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"146 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"194.9 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"243.5 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"300.2 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"338.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish338.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish339 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish341.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1087

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
95.6TBC
341.5AMH02 1087
2DAGS
338.9SAP
146TBC
194.9TBC
0MWL
243.5TBC
0MWM
339DAGS
2SSS
0AMH02 1088
300.2TBA
2MGO30% MAG COAT
46.7TBC
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
2SAP
338.9SSS

Properties (7)

additional_info
630138011322201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-01-13T22:25:11-08:00
documentation
PRO PIPE
is_lateral_inspection
false