Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 14, 2022, 07:30 AM
  • 02 1085_02 1084_01132022_234026.mp4

Date
01/13/2022
W/O
931783
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00282
PipeID
P03659
Time
11:30 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9828
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_931783_TV02212_JAN2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
21 in.
Upstream MH
02 1085
Downstream MH
02 1084
Dir. of Survey
Downstream
Length Surveyed
341.1 ft.
Total Length
341.1 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
469
Pipe schematic from manhole 02 1085 to 02 1084
MH: 02 1085MH: 02 1084downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 10850 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 40% MAG COAT61.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"111.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"339 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish339.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish339.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish341.1 ft. AMH - Downstream Manhole, Survey Ends - 02 1084

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0AMH02 1085
339.1SAP
2SAP
0MWL
341.1AMH02 1084
2SSS
2DAGS
2MGO40% MAG COAT
61.8TFC
339.1SSS
0MWM
111.7TFC
339DAGS

Properties (7)

additional_info
630138011322201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-01-13T23:30:49-08:00
documentation
PRO PIPE
is_lateral_inspection
false