18 0466_18 0465_3102022_005607.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Reinforcement Corroded, from 12 to 04 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
2 ft. - General Observation - MAG COAT 70%
19.8 ft. - Surface Reinforcement Corroded, from 12 to 04 o'clock, within 8 inches of joint: YES - LONG CIRCUM REBAR
23.4 ft. - Surface Reinforcement Corroded, from 09 to 12 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR
34.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
34.7 ft. - Surface Reinforcement Corroded, from 08 to 12 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
39.5 ft. - Surface Reinforcement Corroded, from 08 to 12 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR
113 ft. - Surface Reinforcement Corroded, from 08 to 12 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR
245.5 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 34.5 | SSS | BLISTERING PEELING CONCRETE |
| 293.3 | SSS | BLISTERING PEELING CONCRETE |
| 293.9 | AMH | 1:30AM |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 2 | SAM | SEVERE AGG |
| 293.3 | SRC | LONG CIRCUM REBAR |
| 19.8 | SRC | LONG CIRCUM REBAR |
| 0 | MWL | — |
| 39.5 | SRC | LONG CIRCUM REBAR |
| 293.3 | SRC | LONG CIRCUM REBAR |
| 2 | SRC | LONG CIRCUM REBAR |
| 141.5 | MWLS | — |
| 0 | AMH | 12:45AM |
| 23.4 | SRC | LONG CIRCUM REBAR |
| 245.5 | SRC | LONG CIRCUM REBAR |
| 2 | MGO | MAG COAT 70% |
| 113 | SRC | LONG CIRCUM REBAR |
| 34.7 | SRC | LONG CIRCUM REBAR |
| 293.3 | SAM | SEVERE AGG |
| 0 | MWM | — |