Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 8, 2022, 10:38 AM
  • 14 0533_14 0532_02082022_025810.mp4

Date
02/08/2022
W/O
936259
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00588
PipeID
P18622
Time
2:38 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9866
Sewer Name
14 35TH STREET WEST TRUNK
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_936259_TV14074_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0533
Downstream MH
14 0532
Dir. of Survey
Downstream
Length Surveyed
529.3 ft.
Total Length
529.3 ft.
Structural Index
3
Structural Quick
3T2T
Structural Rating
525
O&M Index
2
O&M Quick
2T00
O&M Rating
210
Overall Index
2
Overall Quick
Overall Rating
735
Pipe schematic from manhole 14 0533 to 14 0532
MH: 14 0533MH: 14 0532downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 05330 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start526.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish526.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish526.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish529.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0532

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0AMH14 0533
2SAV
529.3AMH14 0532
526.5SAV
0MWL
0MWM
526.5SSS
2SSS
2DAGS
526.5DAGS

Properties (7)

additional_info
630138020722201
custom_field_three
VISIBLE AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2022-02-08T02:38:59-08:00
documentation
PRO PIPE
is_lateral_inspection
false