Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 2, 2022, 07:50 AM
  • 05 0660_05 0659_02022022_001414.mp4

Date
02/01/2022
W/O
931734
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00520
PipeID
P05885
Time
11:50 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9899
Sewer Name
05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_931734_TV05343_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
15 in.
Upstream MH
05 0660
Downstream MH
05 0659
Dir. of Survey
Downstream
Length Surveyed
311.3 ft.
Total Length
311.3 ft.
Structural Index
3
Structural Quick
513F
Structural Rating
163
O&M Index
2
O&M Quick
2I00
O&M Rating
100
Overall Index
2
Overall Quick
Overall Rating
263
Pipe schematic from manhole 05 0660 to 05 0659
MH: 05 0660MH: 05 0659downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 06600 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - STAINING3.5 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES8.6 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES8.6 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start11.9 ft. FS - Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES15.1 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - UNDER FLOW25.6 ft. CM - Crack Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES37 ft. FS - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES41.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4"46 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES71.2 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish71.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES73.5 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish90 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"111.6 ft. FL - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES122.9 ft. FS - Fracture Spiral, from 10 to 11 o'clock, within 8 inches of joint: YES138.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4"144.7 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start152 ft. CS - Crack Spiral, from 10 to 11 o'clock, within 8 inches of joint: YES155.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start162.3 ft. FS - Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES166.3 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - UNDER FLOW169.6 ft. FS - Fracture Spiral, from 02 to 03 o'clock, within 8 inches of joint: YES180.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start187 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4"194.5 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish194.5 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish198.1 ft. FS - Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES237.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"280.7 ft. HSV - Hole Soil Visible, at 10 o'clock, within 8 inches of joint: NO308.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish308.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish311.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK311.3 ft. AMH - Downstream Manhole, Survey Ends - 05 0659

Observation photos (18)

  • Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES

    3.5 ft. - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 10 %of cross sectional area, at 09 o'clock,  , within 8 inches of joint: YES

    8.6 ft. - Deposits Attached Grease, 10 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES

  • Water Level, Sag in pipe, 15 %of cross sectional area, Start

    8.6 ft. - Water Level, Sag in pipe, 15 %of cross sectional area, Start

  • Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES

    11.9 ft. - Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES

    25.6 ft. - Crack Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES

    37 ft. - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    46 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    71.2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    111.6 ft. - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 10 to 11 o'clock, within 8 inches of joint: YES

    122.9 ft. - Fracture Spiral, from 10 to 11 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 10 %of cross sectional area, Start

    144.7 ft. - Water Level, Sag in pipe, 10 %of cross sectional area, Start

  • Crack Spiral, from 10 to 11 o'clock, within 8 inches of joint: YES

    152 ft. - Crack Spiral, from 10 to 11 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    155.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES

    162.3 ft. - Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 02 to 03 o'clock, within 8 inches of joint: YES

    169.6 ft. - Fracture Spiral, from 02 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    180.1 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

    198.1 ft. - Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Hole Soil Visible, at 10 o'clock, within 8 inches of joint: NO

    280.7 ft. - Hole Soil Visible, at 10 o'clock, within 8 inches of joint: NO

Observations (37)

DistanceCodeObservation
2MGOSTAINING
138.1TF
11.9FS
198.1FS
194.5DSC
71.2MWLS
3.5FC
166.3DSCUNDER FLOW
155.4DAGS
308.6DAGS
0MWM
122.9FS
0AMH05 0660
15.1DSCUNDER FLOW
71.2CM
311.3MGOCONNECTION AT MH 3 O'CLOCK
8.6DAGS
180.1CM
111.6FL
73.5DSC
41.3TF
280.7HSV
169.6FS
162.3FS
90TF
0MWL
194.5MWLS
25.6CM
46CM
144.7MWLS
311.3AMH05 0659
37FS
152CS
308.6CM
237.9TFC
187TF
8.6MWLS

Properties (7)

additional_info
630098020122201
custom_field_three
HOLE IN PIPE, FRACTURES
custom_field_two
1
customer
1
datetime
2022-02-01T23:50:45-08:00
documentation
PROPIPE
is_lateral_inspection
false