Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 24, 2022, 10:44 AM
  • 05 0671_05 0670_01242022_030703.mp4

Date
01/24/2022
W/O
931491
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00520
PipeID
P05898
Time
2:44 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9711
Sewer Name
05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_931491_TV05368_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 0671
Downstream MH
05 0670
Dir. of Survey
Downstream
Length Surveyed
330.3 ft.
Total Length
330.3 ft.
Structural Index
3
Structural Quick
413G
Structural Rating
127
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
127
Pipe schematic from manhole 05 0671 to 05 0670
MH: 05 0671MH: 05 0670downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 06710 ft. MWM - Water Mark, 15 %of cross sectional area3.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES26.1 ft. CM - Crack Multiple, from 05 to 08 o'clock, within 8 inches of joint: YES29.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES42.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8" - OPEN47.2 ft. CM - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES73.9 ft. CL - Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES95.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 8" - OPEN103.6 ft. CS - Crack Spiral, from 08 to 04 o'clock, within 8 inches of joint: YES113.9 ft. CM - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES136 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8" - OPEN144 ft. FM - Fracture Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES148.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8" - OPEN152.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start188.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8" - OPEN199.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8" - OPEN239.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8" - OPEN251.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8" - OPEN287.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8" - OPEN300.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"328.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish330.3 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE330.3 ft. AMH - Downstream Manhole, Survey Ends - 05 0670330.3 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (9)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    3.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 05 to 08 o'clock, within 8 inches of joint: YES

    26.1 ft. - Crack Multiple, from 05 to 08 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    29.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

    47.2 ft. - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES

    73.9 ft. - Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 08 to 04 o'clock, within 8 inches of joint: YES

    103.6 ft. - Crack Spiral, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

    113.9 ft. - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES

    144 ft. - Fracture Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    152.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (26)

DistanceCodeObservation
152.7CM
136TFOPEN
3.6SSS
0MWL
42.8TFOPEN
330.3MGOCONN @ MH 3 O'CLOCK/ACTIVE
0AMH05 0671
73.9CL
148.6TFOPEN
113.9CM
95.3TFOPEN
251.9TFOPEN
330.3AMH05 0670
287.9TFOPEN
103.6CS
330.3MGOCONN @ MH 9 O'CLOCK/ACTIVE
239.1TFOPEN
26.1CM
0MWM
47.2CM
144FM
199.6TFOPEN
188.1TFOPEN
29.3CM
300.1TFC
328.8CM

Properties (7)

additional_info
630098012422001
custom_field_three
MULTIPLE CRACKS/SPALLING
custom_field_two
3
customer
1
datetime
2022-01-24T02:44:23-08:00
documentation
PRO PIPE
is_lateral_inspection
false