Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 7, 2022, 09:33 AM
  • 22 0250_22 0249_01072022_015602.mp4

Date
01/07/2022
W/O
931878
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00793
PipeID
P16532
Time
1:33 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9758
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_931878_TV22016_JAN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0250
Downstream MH
22 0249
Dir. of Survey
Downstream
Length Surveyed
390.1 ft.
Total Length
390.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 22 0250 to 22 0249
MH: 22 0250MH: 22 0249downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 02502 ft. MGO - General Observation - LINED PIPE16.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"92.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"125.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"180 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"222.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"258.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"270.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"323.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"390.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0249390.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (1)

  • Upstream Manhole, Survey Begins - 22 0250

    0 ft. - Upstream Manhole, Survey Begins - 22 0250

Observations (15)

DistanceCodeObservation
258.9TF
180TF
125.1TF
0MWM
390.1AMH22 0249
92.1TF
2MGOLINED PIPE
16.2TF
222.1TF
270.7TFA
390.1MGOCONNECTION AT MH 3 O'CLOCK
0MWL
0MGOCONNECTION AT MH 3 O'CLOCK
323.6TF
0AMH22 0250

Properties (7)

additional_info
6300908010622201
custom_field_three
RFIR NO SEVERE DEFECTS. (LINED PIPE)
custom_field_two
3
customer
1
datetime
2022-01-07T01:33:19-08:00
documentation
PROPIPE
is_lateral_inspection
false