Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 10, 2022, 09:38 AM
  • 01 0023_01 0022_01102022_015156.mp4

Date
01/10/2022
W/O
926971
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00209
PipeID
P00773
Time
1:38 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9820
Sewer Name
01 HOOPER AVENUE-COMPTON CREEK TRUNK
City
WILLOWBROOK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_926971_TV01045_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
15 in.
Upstream MH
01 0023
Downstream MH
01 0022
Dir. of Survey
Downstream
Length Surveyed
285.2 ft.
Total Length
285.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 01 0023 to 01 0022
MH: 01 0023MH: 01 0022downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 AND 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 01 00230 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start103.6 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"154.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"207.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"232.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"277.1 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"283.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish283.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK285.2 ft. AMH - Downstream Manhole, Survey Ends - 01 0022

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2SAP
0MGOCONNECTION AT MH 3 AND 9 O'CLOCK
0AMH01 0023
283.4SAP
277.1TBA
207.1TF
232.7TFA
285.2MGOCONNECTION AT MH 9 O'CLOCK
285.2AMH01 0022
103.6TBA
154.8TF
0MWL
283.4SSS
2SSS

Properties (7)

additional_info
630138011022001
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2022-01-10T01:38:32-08:00
documentation
PRO PIPE
is_lateral_inspection
false