Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 10, 2022, 11:59 AM
  • F 0272_F 0271_01102022_040949.mp4

Date
01/10/2022
W/O
926987
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00040
PipeID
P10225
Time
3:59 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9823
Sewer Name
F JOINT OUTFALL F - UNIT 4 RELIEF
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
33
Purpose
Routine Assessment
Project
RFIR_WO_926987_TV02367_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
15 in.
Upstream MH
F 0272
Downstream MH
F 0271
Dir. of Survey
Downstream
Length Surveyed
254.8 ft.
Total Length
254.8 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole F 0272 to F 0271
MH: F 0272MH: F 0271downstream0 ft. AMH - Upstream Manhole, Survey Begins - F 02720 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3.5 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start252.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish252.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish252.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish252.4 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish254.8 ft. AMH - Downstream Manhole, Survey Ends - F 0271

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.5 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
252.4DAGS
0AMHF 0272
3.5SRV
0MWM
2SAP
252.4SSS
252.4SAP
2SSS
0MWL
252.4SRV
254.8AMHF 0271
2DAGS

Properties (8)

additional_info
630138011022004
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-01-10T03:59:33-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
31219