Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 14, 2022, 11:12 AM
  • F 0269_F 0268_01142022_033506.mp4

Date
01/14/2022
W/O
926987
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00040
PipeID
P10222
Time
3:12 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9830
Sewer Name
F JOINT OUTFALL F - UNIT 4 RELIEF
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
RFIR_WO_926987_TV02367_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
15 in.
Upstream MH
F 0269
Downstream MH
F 0268
Dir. of Survey
Downstream
Length Surveyed
737.9 ft.
Total Length
737.9 ft.
Structural Index
3
Structural Quick
513\
Structural Rating
735
O&M Index
2
O&M Quick
2]00
O&M Rating
296
Overall Index
2
Overall Quick
Overall Rating
1031
Pipe schematic from manhole F 0269 to F 0268
MH: F 0269MH: F 0268downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 02692 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start6.6 ft. MGO - General Observation - MAG COAT278.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES724.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS734.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish734.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish734.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish734.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish737.9 ft. AMH - Downstream Manhole, Survey Ends - F 0268737.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    6.6 ft. - General Observation - MAG COAT

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

    278.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (15)

DistanceCodeObservation
0MWL
734.1SSS
278.1SRV
2DAGS
734.1DAGS
737.9AMHF 0268
2SSS
737.9MGOCONNECTION AT MH 3 O'CLOCK
734.2SAP
2SAP
0MWM
6.6MGOMAG COAT
724.7DSZDEBRIS
0AMHF 0269
734.2DSZ

Properties (8)

additional_info
630138011322203
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2022-01-14T03:12:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
31219