Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 15, 2021, 09:40 AM
  • 03 0412_03 0411_11152021_015219.mp4

Date
11/15/2021
W/O
921607
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00373
PipeID
P05174
Time
1:40 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9535
Sewer Name
03 MARINA TRUNK, SECTION 4
City
LONG BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_921607_TV03163_NOV2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
24 in.
Upstream MH
03 0412
Downstream MH
03 0411
Dir. of Survey
Downstream
Length Surveyed
302 ft.
Total Length
302 ft.
Structural Index
4
Structural Quick
554F
Structural Rating
219
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
219
Pipe schematic from manhole 03 0412 to 03 0411
MH: 03 0412MH: 03 0411downstream0 ft. AMH - Upstream Manhole, Survey Begins - 03 04120 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK CAPPED0 ft. MWM - Water Mark, 35 %of cross sectional area27.9 ft. FL - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES, Start43.5 ft. FL - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES, Finish43.5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start80.5 ft. B - Broken, from 10 to 03 o'clock, within 8 inches of joint: YES, Start103.3 ft. B - Broken, from 10 to 03 o'clock, within 8 inches of joint: YES, Finish150.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"224.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish234.7 ft. FC - Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES239.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start302 ft. AMH - Downstream Manhole, Survey Ends - 03 0411302 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish302 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK CAPPED

Observation photos (4)

  • Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES, Start

    27.9 ft. - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    43.5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES

    234.7 ft. - Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    239.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0AMH03 0412
0MWL
224.4FM
43.5FL
302AMH03 0411
27.9FL
150.8TFC
0MGOCONNECTION AT THE MH 9 OC'LOCK CAPPED
234.7FC
302CM
103.3B
302MGOCONNECTION AT THE MH 9 OC'LOCK CAPPED
43.5FM
80.5B
239.5CM
0MWM

Properties (7)

additional_info
630074111521001
custom_field_three
BREAKS / MULTIPLE FRACTURES
custom_field_two
1
customer
1
datetime
2021-11-15T01:40:52-08:00
documentation
PROPIPE
is_lateral_inspection
false