Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 23, 2021, 06:49 AM
  • 22 0295_22 0294_12222021_231021.mp4

Date
12/22/2021
W/O
931725
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00793
PipeID
P16581
Time
10:49 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9753
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_931725_TV22014_JAN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0295
Downstream MH
22 0294
Dir. of Survey
Downstream
Length Surveyed
359.3 ft.
Total Length
359.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2M00
O&M Rating
142
Overall Index
2
Overall Quick
Overall Rating
142
Pipe schematic from manhole 22 0295 to 22 0294
MH: 22 0295MH: 22 0294downstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02951.8 ft. MGO - General Observation - LINED PIPE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start26.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN115.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN147.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN233.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN289.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN357 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish359.3 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE359.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0294

Observations (14)

DistanceCodeObservation
26.4TFOPEN
147.7TFOPEN
115.8TFOPEN
359.3MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
2DAGS
357DAGS
233.1TFOPEN
0MWM
0MWL
289.9TFOPEN
0AMH22 0295
1.8MGOLINED PIPE
359.3AMH22 0294

Properties (7)

additional_info
630098122221201
custom_field_three
LINED PIPE
custom_field_two
4
customer
1
datetime
2021-12-22T22:49:42-08:00
documentation
PROPIPE
is_lateral_inspection
false