Wastewater/Activity/PacpInspection/1.0Dec 23, 2021, 09:50 AM
  • 22 0292_22 0291_12232021_021743.mp4

Date
12/23/2021
W/O
931725
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00793
PipeID
P16578
Time
1:50 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9753
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_931725_TV22014_JAN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0292
Downstream MH
22 0291
Dir. of Survey
Downstream
Length Surveyed
428.4 ft.
Total Length
428.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2P00
O&M Rating
174
Overall Index
2
Overall Quick
Overall Rating
174
Pipe schematic from manhole 22 0292 to 22 0291
MH: 22 0292MH: 22 0291downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02920 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area1.8 ft. MGO - General Observation - LINED PIPE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN31.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN169.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN173.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN181.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN306.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN310.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN319.1 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: NO, 4" - 80% ROOTS-LATERAL/OPEN324.3 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: NO, 4" - 70% ROOTS-LATERAL/OPEN395.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN404.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN426 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish428.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0291

Observations (19)

DistanceCodeObservation
310.7TFOPEN
0AMH22 0292
31.1TFOPEN
1.8MGOLINED PIPE
306.9TFOPEN
319.1TFD80% ROOTS-LATERAL/OPEN
2DAGS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MWL
395.9TFOPEN
6.5TFOPEN
324.3TFD70% ROOTS-LATERAL/OPEN
181.3TFOPEN
173.2TFOPEN
428.4AMH22 0291
0MWM
404.8TFOPEN
426DAGS
169.9TFOPEN

Properties (7)

additional_info
630098122221201
custom_field_three
LINED PIPE
custom_field_two
4
customer
1
datetime
2021-12-23T01:50:16-08:00
documentation
PROPIPE
is_lateral_inspection
false