Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 16, 2021, 09:13 AM
  • B 0697_B 0696_12162021_013330.mp4

Date
12/16/2021
W/O
926783
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00110
PipeID
P09367
Time
1:13 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9650
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_926783_TV22155_DEC2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
54 in.
Upstream MH
B 0697
Downstream MH
B 0696
Dir. of Survey
Downstream
Length Surveyed
395.3 ft.
Total Length
395.3 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
390
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
390
Pipe schematic from manhole B 0697 to B 0696
MH: B 0697MH: B 0696downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 06970 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COATING2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start45.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"52.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"76.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"83 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"170 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"173 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"203.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"207.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"261.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"270.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"309.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"312.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"393 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish393.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish395.3 ft. AMH - Downstream Manhole, Survey Ends - B 0696395.3 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
2.3SAP
0AMHB 0697
45.7TFC
270.9TF
52.3TF
309.5TF
0MWL
2.3MGOMAG COATING
76.4TF
207.4TFC
393SSS
0MWM
170TF
173TF
203.8TF
83TF
0MGOCONNECTION AT MH 3 O'CLOCK
395.3AMHB 0696
261.3TFA
2.3SSS
393.2SAP
395.3MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
312.3TF

Properties (7)

additional_info
630098121521201
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-12-16T01:13:10-08:00
documentation
PROPIPE
is_lateral_inspection
false