20 0305_20 0304_12272021_225355.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
2.2 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS
16 ft. - Fracture Spiral, from 01 to 06 o'clock, within 8 inches of joint: YES
21.1 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES
21.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: YES
172.5 ft. - Fracture Multiple, from 01 to 08 o'clock, within 8 inches of joint: YES
192.7 ft. - Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES
212.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 303.6 | DAGS | — |
| 46.6 | DSZ | — |
| 303.6 | CM | — |
| 0 | AMH | 20 0305 |
| 21.1 | CL | — |
| 244.8 | TFC | — |
| 21.1 | DAE | — |
| 306.5 | AMH | 20 0304 |
| 192.7 | CS | — |
| 0 | MWL | — |
| 172.5 | FM | — |
| 16 | FS | — |
| 235 | TF | — |
| 2.2 | DSZ | DEBRIS |
| 2 | DAGS | — |
| 212.9 | CM | — |