Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 1, 2021, 05:56 AM
  • H 0634_H 0633_09302021_220802.mp4

Date
09/30/2021
W/O
916367
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00183
PipeID
P10955
Time
10:56 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9395
Sewer Name
H JOINT OUTFALL H - UNIT 7B
City
CITY OF INDUSTRY
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
38
Purpose
Routine Assessment
Project
RFIR_WO_916367_TV15231_OCT2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 0634
Downstream MH
H 0633
Dir. of Survey
Downstream
Length Surveyed
80.2 ft.
Total Length
80.2 ft.
Structural Index
3
Structural Quick
3B2A
Structural Rating
59
O&M Index
2
O&M Quick
2A00
O&M Rating
20
Overall Index
2
Overall Quick
Overall Rating
79
Pipe schematic from manhole H 0634 to H 0633
MH: H 0634MH: H 0633downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 06340 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area9 ft. MGO - General Observation - MAG COATING THROUGHOUT9 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start26.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start26.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS74.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish74.9 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish74.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish80.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE80.2 ft. AMH - Downstream Manhole, Survey Ends - H 0633

Observation photos (4)

  • General Observation - MAG COATING THROUGHOUT

    9 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    9 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    26.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    80.2 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (12)

DistanceCodeObservation
74.9SSS
0AMHH 0634
26.2SSS
9MGOMAG COATING THROUGHOUT
80.2MGOCOCKROACHES IN MANHOLE
9SAV
0MWM
26.2DSZDEBRIS
80.2AMHH 0633
0MWL
74.9SAV
74.9DSZ

Properties (6)

additional_info
630069093021201
custom_field_two
3
customer
1
datetime
2021-09-30T22:56:24-07:00
documentation
PRO PIPE
is_lateral_inspection
false