Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 19, 2021, 10:36 AM
  • B 0566_B 0565_11192021_025107.mp4

Date
11/19/2021
W/O
922056
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00101
PipeID
P09114
Time
2:36 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9604
Sewer Name
B JOINT OUTFALL B - UNIT 7
City
ROSEMEAD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
26
Purpose
Routine Assessment
Project
WO_922056_TV15120_NOV2021
Sewer Type
Gravity
Material
CIP
Shape
Circular
Height
12 in.
Width
21 in.
Upstream MH
B 0566
Downstream MH
B 0565
Dir. of Survey
Downstream
Length Surveyed
433.6 ft.
Total Length
433.6 ft.
Structural Index
3
Structural Quick
523P
Structural Rating
440
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
566
Pipe schematic from manhole B 0566 to B 0565
MH: B 0566MH: B 0565downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 05662 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start34.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"57.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS70 ft. BVV - Broken Void Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start70 ft. MGP - General Photograph - BROKEN PIPE71.2 ft. MGP - General Photograph - BROKEN PIPE71.2 ft. MGP - General Photograph - BROKEN PIPE73.4 ft. BVV - Broken Void Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish371.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish431.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish431.1 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish433.6 ft. MGO - General Observation - COCKROACHES IN MANHOLE433.6 ft. AMH - Downstream Manhole, Survey Ends - B 0565

Observation photos (7)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Broken Void Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    70 ft. - Broken Void Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph - BROKEN PIPE

    70 ft. - General Photograph - BROKEN PIPE

  • General Photograph - BROKEN PIPE

    71.2 ft. - General Photograph - BROKEN PIPE

  • General Photograph - BROKEN PIPE

    71.2 ft. - General Photograph - BROKEN PIPE

  • General Observation - COCKROACHES IN MANHOLE

    433.6 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
431.1SSS
0MWL
70BVV
0MWM
70MGPBROKEN PIPE
433.6MGOCOCKROACHES IN MANHOLE
371.5DSZ
71.2MGPBROKEN PIPE
73.4BVV
433.6AMHB 0565
2SSS
0AMHB 0566
34.4TBA
71.2MGPBROKEN PIPE
57.4DSZDEBRIS
431.1SCP
2SCP

Properties (7)

additional_info
630069111821201
custom_field_three
METAL PIPE CORROSION
custom_field_two
1
customer
1
datetime
2021-11-19T02:36:44-08:00
documentation
PRO PIPE
is_lateral_inspection
false