Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 13, 2022, 03:43 PM
  • 29 0689_29 0264_01132022_080530.mp4

Date
01/13/2022
W/O
931728
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00550
PipeID
P24169
Time
7:43 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9768
Sewer Name
29 WEST HILL STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_931728_TV29063_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0689
Downstream MH
29 0264
Dir. of Survey
Downstream
Length Surveyed
354.3 ft.
Total Length
354.3 ft.
Structural Index
4
Structural Quick
5141
Structural Rating
15
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
15
Pipe schematic from manhole 29 0689 to 29 0264
MH: 29 0689MH: 29 0264downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 06890 ft. MWL - Water Level, 0 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area30.4 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"76.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"192.1 ft. FM - Fracture Multiple, from 04 to 10 o'clock, within 8 inches of joint: YES196.9 ft. B - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES198.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"200.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"259.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"302.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"336.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"347.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES350.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES354.3 ft. AMH - Downstream Manhole, Survey Ends - 29 0264

Observation photos (4)

  • Fracture Multiple, from 04 to 10 o'clock, within 8 inches of joint: YES

    192.1 ft. - Fracture Multiple, from 04 to 10 o'clock, within 8 inches of joint: YES

  • Broken, from 12 to 12 o'clock, within 8 inches of joint: YES

    196.9 ft. - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    347.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    350.2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (15)

DistanceCodeObservation
0AMH29 0689
0MWL
76.3TFA
0MWM
350.2CM
347.1CM
196.9B
302.3TFC
198.1TF
192.1FM
336.2TF
200.5TFC
354.3AMH29 0264
259.1TFC
30.4TFC

Properties (7)

additional_info
630138011322061
custom_field_three
BROKEN, FRACTURES
custom_field_two
1
customer
1
datetime
2022-01-13T07:43:07-08:00
documentation
PROPIPE
is_lateral_inspection
false