22 1299A_22 1299_2162022_015033.mp4
2 ft. - Surface Aggregate Missing, from 04 to 08 o'clock, within 8 inches of joint: NO - SEVERE AGG
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE
2 ft. - Surface Aggregate Missing, from 04 to 08 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
4 ft. - Surface Reinforcement Visible, from 05 to 07 o'clock, within 8 inches of joint: NO - CIRCUM REBAR POSSIBLE
43.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
80.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 108.2 | MGO | Conn. @ Mh, 9 O' Clock. Active LARGE INCOMING |
| 108.2 | SAV | SEVERE AGG SPORATIC |
| 80.2 | SSS | BLISTERING CONCRETE |
| 0 | AMH | 2:15AM |
| 4 | SRV | CIRCUM REBAR POSSIBLE |
| 108.2 | SAV | SEVERE AGG SPORATIC |
| 0 | MWL | — |
| 2 | SAM | SEVERE AGG |
| 108.2 | SAM | SEVERE AGG |
| 108.2 | SSS | BLISTERING CONCRETE |
| 2 | SSS | BLISTERING CONCRETE |
| 54.4 | MWL | — |
| 43.4 | SAV | SEVERE AGG SPORATIC |
| 108.7 | AMH | 2:35AM |
| 0 | MWM | — |
| 2 | SAM | SEVERE AGG |