Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 2, 2021, 08:16 AM
  • 15 0079_15 0078_11022021_002916.mp4

Date
11/02/2021
W/O
921812
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00633
PipeID
P11991
Time
1:16 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9481
Sewer Name
15 TURNBULL CANYON TRUNK
City
CITY OF INDUSTRY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
38
Purpose
Routine Assessment
Project
WO_921812_TV15032_NOV2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0079
Downstream MH
15 0078
Dir. of Survey
Downstream
Length Surveyed
351.3 ft.
Total Length
351.3 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
177
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
315
Pipe schematic from manhole 15 0079 to 15 0078
MH: 15 0079MH: 15 0078downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 00790 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start24.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"59.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start75.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"127 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"172.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"224.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"274.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"325.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"345.4 ft. FS - Fracture Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES349.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish349.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish351.3 ft. AMH - Downstream Manhole, Survey Ends - 15 0078351.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    59.1 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

    345.4 ft. - Fracture Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

  • General Observation - COCKROACHES IN MANHOLE

    351.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
0MWM
351.3AMH15 0078
172.4TFC
325.7TF
351.3MGOCOCKROACHES IN MANHOLE
0AMH15 0079
0MWL
345.4FS
224.2TFC
127TFC
274.6TFA
2DAGS
75.7TFC
349.1DAGS
0MGOCOCKROACHES IN MANHOLE
24.3TFC
349.1CM
59.1CM

Properties (7)

additional_info
630069110121202
custom_field_three
FRACTURE/MULTIPLE CRACKS
custom_field_two
2
customer
1
datetime
2021-11-02T01:16:24-07:00
documentation
PRO PIPE
is_lateral_inspection
false