Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 18, 2022, 08:08 PM
  • 05 0128A_05 0128_01182022_122900.mp4

Date
01/18/2022
W/O
926779
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00431
PipeID
P05419
Time
12:08 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9708
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_926779_TV05373_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
42 in.
Upstream MH
05 0128
Downstream MH
05 0128A
Dir. of Survey
Upstream
Length Surveyed
333.6 ft.
Total Length
333.6 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 05 0128 to 05 0128A
MH: 05 0128MH: 05 0128Aupstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 0128A3.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish3.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish7.2 ft. RMB - Roots Medium Barrell, from 09 to 03 o'clock, 15 %, within 8 inches of joint: YES, Finish26.8 ft. RMB - Roots Medium Barrell, from 09 to 03 o'clock, 15 %, within 8 inches of joint: YES, Start37.3 ft. RFB - Roots Fine Barrell, from 10 to 02 o'clock64.8 ft. RFB - Roots Fine Barrell, from 09 to 03 o'clock, Finish74.7 ft. RFB - Roots Fine Barrell, from 09 to 03 o'clock, Start181.8 ft. MGO - General Observation - MAG COAT331.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start331.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start333.6 ft. MWL - Water Level, 15 %of cross sectional area333.6 ft. MWM - Water Mark, 15 %of cross sectional area333.6 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK.333.6 ft. AMH - Downstream Manhole, Survey Begins - 05 0128

Observation photos (6)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    151.8 ft. - General Observation - MAG COAT

  • Roots Fine Barrell, from 09 to 03 o'clock, Start

    258.9 ft. - Roots Fine Barrell, from 09 to 03 o'clock, Start

  • Roots Fine Barrell, from 10 to 02 o'clock

    296.3 ft. - Roots Fine Barrell, from 10 to 02 o'clock

  • Roots Medium Barrell, from 09 to 03 o'clock, 15 %, within 8 inches of joint: YES, Start

    306.8 ft. - Roots Medium Barrell, from 09 to 03 o'clock, 15 %, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MWL
326.4RMB
258.9RFB
0MWM
151.8MGOMAG COAT
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK.
296.3RFB
333.6AMH05 0128A
0AMH05 0128
330.4SSS
268.8RFB
306.8RMB
330.4SAP
2SAP
2SSS

Properties (7)

additional_info
630138011822062
custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2022-01-18T12:08:40-08:00
documentation
PROPIPE
is_lateral_inspection
false