22 0175_22 1377_2112022_023347.mp4
0 ft. - General Observation - MH# 175 ABANDONED MH
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE
7.7 ft. - Surface Aggregate Missing, from 11 to 01 o'clock, within 8 inches of joint: YES - SEVERE AGG
10.5 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
10.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
10.5 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - CORRODED MISSING REBAR
11.6 ft. - Surface Missing Wall, from 11 to 01 o'clock, within 8 inches of joint: NO - SOIL VISIBLE
14.7 ft. - Surface Missing Wall, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SOIL VISIBLE SLIGHT VOID
19.7 ft. - Surface Missing Wall, from 12 to 01 o'clock, within 8 inches of joint: YES - SOIL VISIBLE
24.6 ft. - Surface Missing Wall, from 01 to 04 o'clock, within 8 inches of joint: YES, - SOIL VISIBLE SLIGHT VOID
30.8 ft. - Surface Missing Wall, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SOIL VISIBLE SLIGHT VOID
47.3 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR CORRODED MISSING
50.9 ft. - Surface Missing Wall, from 10 to 02 o'clock, within 8 inches of joint: YES - SOIL VISIBLE
53.7 ft. - Surface Missing Wall, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SOIL VISIBLE SLIGHT VOID
53.7 ft. - General Photograph - SOIL VISIBLE SLIGHT VOID
57.6 ft. - Surface Missing Wall, from 11 to 01 o'clock, within 8 inches of joint: NO - VOID
59.3 ft. - Surface Missing Wall, from 10 to 02 o'clock, within 8 inches of joint: NO - DEEP VOID
66 ft. - Surface Missing Wall, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - DEEPER VOID START
81.6 ft. - Surface Missing Wall, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SOIL VISIBLE SLIGHT VOID
100.4 ft. - General Observation - HANGING DEBRIE PAPER
| Distance | Code | Observation |
|---|---|---|
| 11.6 | SMW | SOIL VISIBLE |
| 10.5 | SAM | SEVERE AGG |
| 0 | AMH | 2:30AM |
| 41.5 | SMW | SOIL VISIBLE SLIGHT VOID |
| 106.2 | SRC | LONG CIRCUM REBAR CORRODED MISSING |
| 77.3 | SMW | SOIL VISIBLE SLIGHT VOID |
| 81.6 | SMW | SOIL VISIBLE SLIGHT VOID |
| 7.7 | TFA | Active |
| 2 | SSS | BLISTERING FLAKING CONCRETE |
| 0 | MWL | — |
| 24.6 | SMW | SOIL VISIBLE SLIGHT VOID |
| 57.6 | SMW | VOID |
| 77.3 | SMW | DEEPER VOID SOIL VISIBLE |
| 89.3 | MWM | — |
| 53.7 | SMW | SOIL VISIBLE SLIGHT VOID |
| 106.2 | DSZ | ROCKS |
| 0 | MWM | — |
| 100.4 | MGO | HANGING DEBRIE PAPER |
| 30.8 | SMW | SOIL VISIBLE SLIGHT VOID |
| 53.7 | MGP | SOIL VISIBLE SLIGHT VOID |
| 50.9 | SMW | SOIL VISIBLE |
| 106.2 | SRC | LONG CIRCUM REBAR CORRODED MISSING CORRISON BEYOUND REBAR |
| 106.9 | AMH | 3:35AM |
| 106.2 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 10.5 | SSS | BLISTERING PEELING CONCRETE |
| 106.2 | SSS | BLISTERING PEELING CONCRETE |
| 59.3 | SMW | DEEP VOID |
| 92 | DSZ | ROCKS |
| 14.7 | SMW | SOIL VISIBLE SLIGHT VOID |
| 10.5 | SRC | CORRODED MISSING REBAR |
| 0 | MGO | MH# 175 ABANDONED MH |
| 19.7 | SMW | SOIL VISIBLE |
| 106.2 | SAM | SEVERE AGG |
| 10.5 | SSS | BLISTERING FLAKING CONCRETE |
| 100.4 | SMW | SOIL VISIBLE SLIGHT VOID |
| 7.7 | SAM | SEVERE AGG |
| 66 | SMW | DEEPER VOID START |
| 47.3 | SRC | LONG CIRCUM REBAR CORRODED MISSING |
| 18.8 | SMW | SOIL VISIBLE VOID |