- Date
- 01/25/2022
- W/O
- 931722
- Weather
- Dry
- Operator/Surveyor
- S. LOPEZ
- Sewer ID
- Z00312
- PipeID
- P02748
- Time
- 2:55 AM
- Certificate
- U-0720-70309212
- System Owner
- 1
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K9713
- Sewer Name
- 02 70TH WAY EXTENSION TRUNK
- City
- PARAMOUNT
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 35
- Purpose
- Routine Assessment
- Project
- RFIR_WO_931722_TV02338_JAN2022
- Sewer Type
- Gravity
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 15 in.
- Width
- 18 in.
- Upstream MH
- 02 0433
- Downstream MH
- 02 0425
- Dir. of Survey
- Upstream
- Length Surveyed
- 338.5 ft.
- Total Length
- 338.5 ft.
- Structural Index
- 3
- Structural Quick
- 413K
- Structural Rating
- 178
- O&M Index
- 2
- O&M Quick
- 2W00
- O&M Rating
- 242
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 420
Pipe schematic from manhole 02 0433 to 02 0425 Observation photos (5)

2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

20.6 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

46.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

71.5 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES, Start

252.3 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES