Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 19, 2022, 06:49 AM
  • B 0633_B 0632_01182022_230047.mp4

Date
01/18/2022
W/O
931534
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00108
PipeID
P09299
Time
10:49 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9837
Sewer Name
B JOINT OUTFALL B - UNIT 8E
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_931534_TV15229_JAN2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
15 in.
Upstream MH
B 0633
Downstream MH
B 0632
Dir. of Survey
Downstream
Length Surveyed
283.2 ft.
Total Length
283.2 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
280
O&M Index
2
O&M Quick
2J00
O&M Rating
112
Overall Index
2
Overall Quick
Overall Rating
392
Pipe schematic from manhole B 0633 to B 0632
MH: B 0633MH: B 0632downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 06332 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 40% MAG COAT280.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish280.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish280.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish283.2 ft. AMH - Downstream Manhole, Survey Ends - B 0632283.2 ft. MGO - General Observation - ROACHES @ MH

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - 40% MAG COAT

    2 ft. - General Observation - 40% MAG COAT

  • General Observation - ROACHES @ MH

    283.2 ft. - General Observation - ROACHES @ MH

Observations (13)

DistanceCodeObservation
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MWL
2SSS
280.7SAV
2SAV
2DAGS
2MGO40% MAG COAT
280.7SSS
280.7DAGS
283.2AMHB 0632
283.2MGOROACHES @ MH
0MWM
0AMHB 0633

Properties (7)

additional_info
630138011822201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-01-18T22:49:32-08:00
documentation
PRO PIPE
is_lateral_inspection
false