Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 24, 2022, 07:06 PM
  • A 0613_A 0612_01242022_111856.mp4

Date
01/24/2022
W/O
926597
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00316
PipeID
P07818
Time
11:06 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9581
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_926597_TV21041_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
51 in.
Upstream MH
A 0613
Downstream MH
A 0612
Dir. of Survey
Downstream
Length Surveyed
427.5 ft.
Total Length
427.5 ft.
Structural Index
3
Structural Quick
5P3P
Structural Rating
850
O&M Index
2
O&M Quick
2P00
O&M Rating
170
Overall Index
3
Overall Quick
Overall Rating
1020
Pipe schematic from manhole A 0613 to A 0612
MH: A 0613MH: A 0612downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 06130 ft. MGO - General Observation - AIRLINE0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 30% MAG COAT425 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish425 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish425 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish425 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish427.5 ft. AMH - Downstream Manhole, Survey Ends - A 0612

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2DAGS
425SRV
2SSS
425SAP
0MWM
2SAP
425SSS
0AMHA 0613
427.5AMHA 0612
2SRV
0MGOAIRLINE
0MWL
425DAGS
2MGO30% MAG COAT

Properties (7)

additional_info
630098012422061
custom_field_three
REINFORCEMENT VISIBLE/AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2022-01-24T11:06:53-08:00
documentation
PROPIPE
is_lateral_inspection
false