Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 21, 2021, 06:55 PM
  • A 0589_A 0588_12212021_112940.mp4

Date
12/21/2021
W/O
926597
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00316
PipeID
P07794
Time
10:55 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9702
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
HACIENDA HEIGHTS
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
34
Purpose
Routine Assessment
Project
RFIR_WO_926597_TV21041_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
30 in.
Upstream MH
A 0589
Downstream MH
A 0588
Dir. of Survey
Downstream
Length Surveyed
187 ft.
Total Length
187 ft.
Structural Index
3
Structural Quick
5F3F
Structural Rating
370
O&M Index
2
O&M Quick
2F00
O&M Rating
74
Overall Index
3
Overall Quick
Overall Rating
444
Pipe schematic from manhole A 0589 to A 0588
MH: A 0589MH: A 0588downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 05890 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 30% MAG COAT185 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish185 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish187 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish187 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish187 ft. AMH - Downstream Manhole, Survey Ends - A 0588

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 30% MAG COAT

    2 ft. - General Observation - 30% MAG COAT

Observations (13)

DistanceCodeObservation
2SAP
187SRV
2SRV
185SSS
0AMHA 0589
187SAP
185DAGS
0MWM
187AMHA 0588
2DAGS
2SSS
2MGO30% MAG COAT
0MWL

Properties (7)

additional_info
630098122121061
custom_field_three
REINFORCEMENTCORRODED/AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2021-12-21T10:55:27-08:00
documentation
PRO PIPE
is_lateral_inspection
false