Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 25, 2022, 08:33 PM
  • B 0009_B 0008_01252022_124218.mp4

Date
01/25/2022
W/O
926981
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00072
PipeID
P08519
Time
12:33 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9584
Sewer Name
B JOINT OUTFALL B - UNIT 1A
City
CARSON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_926981_TV08132_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
144 in.
Width
33 in.
Upstream MH
B 0009
Downstream MH
B 0008
Dir. of Survey
Downstream
Length Surveyed
300.9 ft.
Total Length
300.9 ft.
Structural Index
4
Structural Quick
5U3K
Structural Rating
850
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
850
Pipe schematic from manhole B 0009 to B 0008
MH: B 0009MH: B 0008downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 00090 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 45 %of cross sectional area7.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.5 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.5 ft. MGO - General Observation - MAG COATING THROUGHOUT40 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BROKEN REBAR300 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BROKEN REBAR300.9 ft. AMH - Downstream Manhole, Survey Ends - B 0008 ZOOMED IN300.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish300.9 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish300.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.5 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
40SRCBROKEN REBAR
7.5SAV
7.5SRV
300.9AMHB 0008 ZOOMED IN
0AMHB 0009
0MWL
300.9SAV
300SRCBROKEN REBAR
0MWM
7.5SSS
300.9SRV
7.5MGOMAG COATING THROUGHOUT
300.9SSS

Properties (8)

additional_info
630098012522052
custom_field_three
BROKEN REBAR/SPALLING
custom_field_two
1
customer
1
datetime
2022-01-25T12:33:33-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
36930