Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 13, 2022, 06:39 AM
  • D 0122_D 0121_01122022_230143.mp4

Date
01/12/2022
W/O
926598
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10031
Time
10:39 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9577
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
REDONDO BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_926598_TV05172_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
27 in.
Upstream MH
D 0122
Downstream MH
D 0121
Dir. of Survey
Downstream
Length Surveyed
451.7 ft.
Total Length
451.7 ft.
Structural Index
2
Structural Quick
5131
Structural Rating
186
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
186
Pipe schematic from manhole D 0122 to D 0121
MH: D 0122MH: D 0121downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - D 01220 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 20 %of cross sectional area2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAG COAT271.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"448.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish448.5 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish448.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish451.6 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK451.6 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK451.7 ft. AMH - Downstream Manhole, Survey Ends - D 0121

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
448.5SSS
451.6MGOCONNECTION AT THE MH 9 OC'LOCK
0MWM
2.1SSS
448.5SRV
0AMHD 0122
2.1SAP
451.7AMHD 0121
2.1SRV
271.7TFA
0MGOCONNECTION AT THE MH 3 OC'LOCK
2.1MGOMAG COAT
451.6MGOCONNECTION AT THE MH 3 OC'LOCK
0MWL
448.5SAP

Properties (7)

additional_info
630074011222201
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE/SPALLIN
custom_field_two
2
customer
1
datetime
2022-01-12T22:39:50-08:00
documentation
PROPIPE
is_lateral_inspection
false