Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 28, 2021, 05:11 AM
  • D 0115_D 0114_12272021_214153.mp4

Date
12/27/2021
W/O
926598
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10023
Time
9:11 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9572
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
REDONDO BEACH
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_926598_TV05172_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
30 in.
Upstream MH
D 0115
Downstream MH
D 0114
Dir. of Survey
Downstream
Length Surveyed
542.3 ft.
Total Length
542.3 ft.
Structural Index
3
Structural Quick
523T
Structural Rating
333
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
333
Pipe schematic from manhole D 0115 to D 0114
MH: D 0115MH: D 0114downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - D 01150 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK2.1 ft. MGO - General Observation - MAG COAT2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start156.1 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO259.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start538.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish540.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish542.2 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK542.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish542.3 ft. AMH - Downstream Manhole, Survey Ends - D 0114

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO

    156.1 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    259.7 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
259.7SRV
2.1MGOMAG COAT
156.1SRV
2.1SSS
538.3SAP
542.3AMHD 0114
0MWM
0MWL
542.2MGOCONNECTION AT THE MH 9 OC'LOCK
2.1SAP
0AMHD 0115
540.8SRV
0MGOCONNECTION AT THE MH 9 OC'LOCK
542.2SSS

Properties (7)

additional_info
630074122721201
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE/SPALLIN
custom_field_two
2
customer
1
datetime
2021-12-27T21:11:12-08:00
documentation
PROPIPE
is_lateral_inspection
false