Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 28, 2021, 06:40 AM
  • D 0106_D 0105_12272021_225213.mp4

Date
12/27/2021
W/O
926598
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10012
Time
10:40 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9572
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_926598_TV05172_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
51 in.
Upstream MH
D 0106
Downstream MH
D 0105
Dir. of Survey
Downstream
Length Surveyed
298.7 ft.
Total Length
298.7 ft.
Structural Index
3
Structural Quick
5K3K
Structural Rating
585
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
585
Pipe schematic from manhole D 0106 to D 0105
MH: D 0106MH: D 0105downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - D 01060 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.3 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start295.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish295.6 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish295.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish298.7 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK298.7 ft. AMH - Downstream Manhole, Survey Ends - D 0105

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.3 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
298.7MGOCONNECTION AT THE MH 9 OC'LOCK
0MWM
298.7AMHD 0105
2.5SSS
0MGOCONNECTION AT THE MH 3 OC'LOCK
295.6SAP
0MWL
295.6SRV
0AMHD 0106
295.6SSS
0MGOCONNECTION AT THE MH 9 OC'LOCK
7.3SRV
2.5SAP

Properties (7)

additional_info
630074122721201
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE/SPALLIN
custom_field_two
2
customer
1
datetime
2021-12-27T22:40:11-08:00
documentation
PROPIPE
is_lateral_inspection
false